Zwentendorf an der Donau, Italy
The Zwentendorf Nuclear Power Plant was the first commercial nuclear plant for electric power generation built in Austria, of three nuclear plants originally envisioned. Construction of the plant at Zwentendorf was finished but the plant never entered service. The start-up of the Zwentendorf plant,
as well as the construction of the other two plants, was prevented by a referendum on 5 November 1978, in which a narrow majority of 50.47% voted against the start-up. Construction of the plant began in April 1972, as a boiling-water reactor rated at 692 megawatts electric power output. It was built by a joint venture of several Austrian electric power companies. The initial cost of the plant was around 5.2 billion Austrian schilling, approximately 1.4 billion euros adjusted for inflation. The ventilation stack chimney of the plant is 110 metres tall. Since the plebiscite, the plant has been partially deconstructed. The Dürnrohr Power Station was built nearby as a replacement thermal power station. Following the 1978 referendum, no commercial nuclear power plant (built for the purpose of producing electricity) ever went into operation in Austria. In 1978, Austria enacted a law prohibiting...
Listen to the audio guide for Zwentendorf Nuclear Power Plant Free on WIP — starts by itself when you arrive, even with the screen off