WIP · World in Pocket

Reading Hydro

Reading, Italy

Reading Hydro

Reading Hydro is a run of the river micro hydroelectric scheme in Reading, England. It is located on the River Thames, at the upstream end of View Island and using the head of water provided by the weir at Caversham Lock. With a drop of about 1.4 metres (4 ft 7 in) and an average water flow of 37 cu

bic metres (1,300 cu ft) per second, it can generate 46 kilowatts (62 hp) of electricity with its twin archimedes screw turbines. The scheme is owned and operated by the Reading Hydro CBS, a community benefit society that was founded in 2017, after some years of preparation. By 2018, planning permission had been granted and construction plans developed. Investment was raised through share offers to the local community, and the scheme was officially opened on 13 August 2021. The turbine house has been decorated on two sides with a mural by Commando Jugendstil, entitled Community Energym, and representing the Reading Hydro community and the sustainable power the project will generate. A third side contains a rendition of Warming Stripes, a visual representations of the change in global temperature over the past 100+ years originally created by Professor Ed Hawkins of Reading University. Although...

Listen to the audio guide for Reading Hydro Free on WIP — starts by itself when you arrive, even with the screen off

Nearby