WIP · World in Pocket

Phu My Bridge

Italy

Phu My Bridge

The Phú Mỹ Bridge (Vietnamese: Cầu Phú Mỹ) is a cable-stayed road bridge over the Saigon River in Ho Chi Minh City, Vietnam. The bridge was constructed from March 2007 to September 2009 by a consortium consisting of Baulderstone, Bilfinger Berger, Freyssinet (cable stays and stressing), and the Viet

namese company CC620 (concrete, formwork, etc.) and was designed by the French consultant Arcadis (design of the main bridge) and Cardno (design of the approaches). The project manager for the project was AECOM. The Phu My Bridge is 705 metres long across the river, with a main span of 380 metres and the approach viaduct structures on either side of the river are approximately 758m and 638m long respectively. The modified H-shaped main towers, which are 145m high, support a 27m wide main span deck. It has six lanes of traffic; two lanes of vehicle traffic in each direction, and a separate lane for motorbikes and pedestrian footways. The bridge will connect District 2 on the north side of the river to District 7 and forms part of a new ring road currently being built around the south and east of Ho Chi Minh City. The bridge was officially opened to traffic in a ceremony attended by the Prime...

Listen to the audio guide for Phu My Bridge Free on WIP — starts by itself when you arrive, even with the screen off

Nearby