松本市, Italy
Nagawado Dam (Japanese: 奈川渡ダム) is a dam in Nagano Prefecture, Japan, on the Azusa River completed in 1969. The dam is located in Azumi, Matsumoto City. Construction began in 1961. The construction of the dam created Lake Azusa. The Azumi Power Station is operated by Tokyo Electric Power Company (TEP
CO). The dam is part of the Azusa 3 Dams, along with Midono Dam; and the Inekoki Dam. The dams use pumped-storage hydroelectricity.
收听语音导览: Nagawado Dam WIP 免费提供 — 到达后自动播放,熄屏也能用