The Ituango Dam, also referred to as the Pescadero-Ituango Dam or Hidroituango, is an embankment dam under construction on the Cauca River near Ituango in Antioquia Department, Colombia. The primary purpose of the project is hydroelectric power generation, and its power plant will have an installed
capacity of 2,456 megawatts (3,294,000 hp) if completed. Preliminary construction on the dam began in September 2011, and the plant was expected to begin operations in late 2018. Heavy rainfall and landslides in April–May 2018 blocked the river's diversion tunnel, threatening a breach of the dam. If completed, Ituango will be the largest power station in Colombia.
Listen to the audio guide for Ituango D Free on WIP — starts by itself when you arrive, even with the screen off