Gariāla, Italy
Ghazi-Barotha Hydropower Project (Urdu: غازى بروتھا) is a 1,450 MW run-of-the-river hydropower project on the Indus River in Pakistan. It is located about 10 km (6.2 mi) west of Attock in the Punjab province. Construction of the project began in 1995. It consists of five generators, each possessing
a maximum power generation capacity of 290 MW. The plant was inaugurated on 19 August 2003, by the then President General Pervez Musharraf. It also saw the commissioning of the first two of the five generators i.e. Unit 1 and Unit 2. The last generator was commissioned on 6 April 2004, and the project was completed by December the same year. It costed US$2.1 billion with funding from Pakistan's Water and Power Development Authority (WAPDA), the World Bank, Asian Development Bank, Japan Bank for International Cooperation, Kreditanstalt für Wiederaufbau, European Investment Bank and Islamic Development Bank. About 1,600 cubic meter per second of water is diverted from the Indus River near the town of Ghazi, Khyber Pakhtunkhwa, about 7 km downstream of Tarbela Dam (4,888 MW). It then runs through a 100 metre wide and 9 metre deep open power channel which is entirely concrete along its 52 km...
Listen to the audio guide for Ghazi-Barotha Hydropower Project Free on WIP — starts by itself when you arrive, even with the screen off