Italy
The Folsom South Canal is an aqueduct in Northern California in the United States. The canal diverts water from the American River at Nimbus Dam in Sacramento County and travels about 26.7 miles (43.0 km) in a southerly direction, terminating near Clay, about 10 miles (16 km) northeast of Lodi. The
canal is operated by the U.S. Bureau of Reclamation, as part of the Auburn-Folsom South Unit of the Central Valley Project. It is contracted for irrigation, industrial and municipal water supply; formerly it provided cooling water for the Rancho Seco Nuclear Generating Station. It is also connected to the Mokelumne Aqueduct, which provides a large portion of the San Francisco Bay Area's water supply. The trapezoidal concrete canal has an average bottom width of 34 feet (10 m), an average depth of 17.8 feet (5.4 m), and a capacity of 3,500 cubic feet per second (99 m3/s). Although it was originally planned to be 69 miles (111 km) long, extending into San Joaquin County, there are currently no plans to construct the remaining sections. Construction of the canal began on July 28, 1952, with the excavation of the diversion inlet channel at Nimbus Dam, then also under construction. However, work...
Listen to the audio guide for Folsom South Canal Free on WIP — starts by itself when you arrive, even with the screen off