宜昌市, Italy
The Gezhouba Dam or Gezhouba Water Control Project (Chinese: 长江葛洲坝水利枢纽工程) on the Yangtze River is located in the western suburbs of Yichang, in central China's Hubei province. One of the largest run-of-the-river dams, it sits several kilometers upstream from downtown Yichang, just downstream of the
fall of the Huangbo River into the Yangtze. Construction started on December 30, 1970 and ended on December 11, 1988. The dam has a total installed electricity generation capacity of 2,715 MW. After rushing out of the Xiling Gorge, the last of the Three Gorges, at Nanjin Pass (南津关), the Yangtze River slows down and widens from 300 metres (980 ft) to about 2,200 metres (7,200 ft) at the dam site, about 3 kilometres (1.9 mi) downstream. Two small islands, Gezhouba and Xiba, divided the river into three channels. There, the Gezhouba Project was built. The facility boasts a generating capacity of 2.71 GW along with three ship locks, and two power stations that generate 14,100 GWh of electricity annually. It has 27 gates of spillway, and a non-flowing dam on both banks. The dam is 2,595 metres (8,514 ft) long with a maximum height of 47 metres (154 ft). The reservoir has a total volume of 1.58...
收听语音导览: diga di Gezhouba WIP 免费提供 — 到达后自动播放,熄屏也能用