北京市, Italy
Beijing Tongzhou railway station (Chinese: 北京通州站; pinyin: Běijīng tōngzhōu zhàn), also known as Beijing Municipal Administrative Center railway station and Beijing Sub-Center railway station, is a railway station in Tongyun Subdistrict, Tongzhou District, Beijing. Construction of the Integrated Tran
sportation Hub (ITH) started construction on 30 November 2019 (2019-11-30). It opened on 30 December 2025 (2025-12-30). It will be the largest underground railway station in Asia. The total site area of the Integrated Transport Hub is 70 hectares (170 acres), with a floorage of 2,230,000 square metres (24,000,000 sq ft) overground. The total investment of the Integrated Transport Hub is approximately 42.1 billion Renminbi. This station and the ITH are designed by AREP, Beijing General Municipal Engineering Design & Research Institute, China Railway Design Corporation, and China Architecture Design Group.
收听语音导览: Beijing Tongzhou Railway Station WIP 免费提供 — 到达后自动播放,熄屏也能用